Our projects range from concrete civil works, roads, bridges and custom services such as concrete cutting and sealing. Our professional reputation is well regarded throughout our Clients and Staff. Give us a call to discuss your requirements on 0447906016 today.

Port HedLand Airport
WBHO Civil
Services: Supplied labour.
Date: 2013

Lyndon River Bridge
Structural Systems
Services: Re-construction of end beams / Expansion joint’s for Lyndon River Bridge
Date: 2014

Atom Supply
TJR Builders
Pour Concrete slab for a local business ATOM Supply, in the Karratha Industrial Estate, with that came Ramps, Aprons and Footpaths.
Services: Carpenters, Steelfixers, Concreters
Date: March 2013
Lost Time Injuries: None


Dampier Highway Upgrade Project
Client: Highways Construction
11,000 m3 of concrete road pavement
Services: We supplied skilled tradesmen and the necessary equipment to complete the task suitable to Main Roads WA standards.
Time Frame: 14 months
Lost Time Injuries: None


Port Hedland Re-alignment Project
Client: John Holland
Construction of 3 new Bridges and 5 new Concrete Intersections
Services: Supplied Labour, 30 metres of Vibrating Screed, Plant
Time Frame: 2013 - Current (2014)

LEED Engineering and Construction
New Water Tank 40km east of Karratha.
Services: Placement of Concrete for Tank Base and Pre-cast Tilt up walls.
Date: 2014

Karratha to Dampier Highway
Client: Albem
Supply Tools and Specified Tradesmen for 3 Brine Channel culverts situated along the Dampier Highway Salt Flats.
Services: A pre-cast yard was assembled for the construction of the Culverts and Culvert bases.
Time Frame: 11 Days
Date: April 2012
Lost Time Injuries: None



ALBEM Operations Pty Ltd
Construction of the 7 mile creek Bridge, and the Re-Furbishment of Existing Bridge. These Bridges coincide with the Dampier Highway Upgrade Project for Main Roads WA, extending from the Town of Karratha to Dampier.
Services:
-
Supply Tools and Labour including Carpenters, Steelfixers, Concretors
-
The Lay out and Construction of Pre-Cast panels
-
Placement of Pre-Cast panels, onto Steel Girders
-
Formwork, Steelfixing & Concrete of Entire Bridge Deck, including all Columns, Headstock’s, Abutments etc.
Date: June 2011 – March 2012
Lost Time Injuries: None

Other Services
Another Service our Company provides is Concrete Cutting and Sealing.
Our Specialised machines cut to range of Depths and Widths, and with the precision of these saw’s it helps Terranora Constructions maintain its Professional Reputation.
Site Title


Broome WEOL Project
Demolish and Re-Instate Concrete Deck
Date: September 2015 - October 2016
Services:
-
3000m3 of Concrete to demolish
-
4000m3 to replace
-
1800 tonnes of steel
-
3000m3 of Cut Concrete